Existing Staircase Proyect.
Change order:
Replace & Install:
1.) 4 1/2″ poplar white 2-posts [1] A-4075 with Oak brown top Cap will be on the bottom Double bull nose step and 3 1/2″ Poplar 3-white posts. [2] A-4076 with Oak brown Cap top will be on top 2nd floor.
2.) Replace & install all black Iron smooth Plain balusters, without twists.
3.) Handrails will remain same oak.
4.) Replace & install Square Oak Rosettes.
1.) Remove existing carpet/runner.
2.) Replace & install Red Oak 14-Steps treads including bottom Double bull nose steps with White Risers (stop last step against existing carpet on 2nd floor.
3.) Replace & install Red Oak Landing treads with primed LWM432 3-1/2″ (gsc14) Sanitary apron moldings under 2nd floor balusters.
4.) Replace & install Red Oak 5-NEWEL POSTS
5.) Replace & install Red Oak 6010 handrails 30′
6.) Replace & install Black Iron 54-Balusters.
7.) Prepare, Stain, apply water based 3-coat polyurethane to all new Stained Grade Oak materials.
8.) Prepare, Paint with 2-coat semi-gloss paint new paint grade Risers & existing Stringers.
9.) Customer responsible to choose Stain, Polyurethane Finish & Paint colors from Sherwin-Williams or other
Brands. Matching 100% with existing colors, wood grain, polyurethane finish not guaranteed.
Carpentry/Staining & Painting.
Description:
Victorian: Boxed Square 4 1/2″ Poplar White A-4075 with Oak brown top cap
Material:
Poplar and Oak top
Finish:
Painted white semigloss. Top to be stained to match handrails and treads